Features:
- Satin, spear point blade made of 7Cr17MoV steel.
- Nail nick opener.
- Black G-10 handle with stainless steel hardware.
- Tip-down pocket clip for secure carry.
Description:
The Long Lead EDC pocket knife from Boker Magnum is an attractive, modern slip joint knife that is great for everyday use. The knife has a sleek, classy appearance and will slide comfortably into your pocket with the tip-down pocket clip, ready to meet your cutting needs.
If you are looking for affordable, interesting designs, be sure to check out more of our
Boker Magnum folding knives.


















Reviews
There are no reviews yet.